Increase Hang Time

Description

  • Increase hang-time over tank, allowing excess solution to dip back into the bath it just came from
  • Tilt rack / barrel over process tank
  • automated line: program the unit to pause over the tank
  • manual line: install a hook over the bath where the operator can hang the rack

Advantages

  • Less contamination of rinse water, because less liquid is transferred on the part
  • Less process water is lost

Implementation Process

  • Evaluate the process to determine an ideal hang-time for a part
  • Allow sufficient dripping
  • Prevent part from drying
  • Install equipment
  • Train and monitor employees – give incentives for superior performance

Vendors